Sunday, April 13, 2014

A LOOK AT THE TRUSSES






Rejean was working in the garage today building a panel to see if his design would work and it did.  He just has to figure out a system to secure the panels at the bottom.   I had no doubts at all.  He now has to make 19 more - 10 on each side of the roof.  Then we will wrap the plastic around the base of the garden to enclose it. The door will not be wrapped and he has plans to put in two windows for ventilation.  He has the watering system all picked out from Lee Valley - it will be on a timer so we don't have to worry about our garden when we are away - or forget to water it.

Now we have to wait for planting season - which may be in July the way things have been going...

1 comment:

  1. Looks like more snow coming your way or it is already there ?

    ReplyDelete